AE Hanger Construction Affects NARA Campus Parking

Primary tabs

Beginning May 17th the parking lot adjacent to the Tech Way Building / Loading Area and all parking around the Tech Way Circle will be closed due to the construction of the AE Hanger Building and site utilities.

Thirty-six (36) alternate parking spaces will be available on the east end of the NARA campus for the duration of construction including additional ADA spaces.

ADA and pedestrian access to the Tech Way Building Loading Area and Facilities has been constructed and will be available for use on Monday May 17.